![]()
LATEST STORIES:
![]()

Partial overnight lane closures on the Niagara-bound Burlington Skyway are expected to run from 10 p.m. Friday until 5 a.m. Monday.
For the entire duration of this closure, one middle lane (lane three of four) on the Skyway Bridge will be closed.
However, two lanes of passing traffic will remain open along the mainline QEW.
One lane to the Burlington Skyway will stay accessible through the Eastport Drive collector ramp.
Lane widths will also be reduced in the work zone and “Narrow Lane” signage will be in place.
READ MORE: Overnight lane closures set for Niagara-bound Burlington Skyway
The Eastport Drive and collector ramp to the Skyway bridge will be closed Friday night to Saturday morning from 10 p.m. to 7 a.m.
From Sunday night to Monday morning, it will be closed from 8 p.m. to 5 a.m.
These closures are put in place to accommodate temporary barrier relocation.
Meanwhile, all ramps at the Northshore Boulevard interchange will remain open.
Eastport Drive will also be fully open as an alternate route to re-enter the QEW Niagara-bound.
READ MORE: Weekend lane closures set for Niagara-bound Burlington Skyway