LATEST STORIES:

Construction begins on new interchange on Highways 5, 6 in Waterdown

Make us a preferred source on Google
Share this story...

Construction has begun on a new interchange at Highways 5 and 6 in Waterdown, which will include a new bridge, and new on and off ramps.

Shovels hit the ground Friday as the Ontario government began work on the widening of a section of Highway 5 to six lanes, building a new commuter parking lot, and adding multi-use paths for pedestrians and cyclists in the area.

“Drivers in Hamilton and Burlington know how frustrating it can be to sit in traffic at Highways 5 and 6 in Waterdown,” said Prabmeet Sarkaria, the Minister of Transportation in a statement. “That is why our government is replacing this busy intersection with a new interchange that will reduce gridlock, improve safety and make life easier for the thousands of drivers who rely on this route everyday.”

CHCH News spoke with people who drive through the area on a regular basis, and say that the traffic at the Highway 5 and Highway 6 intersection is constantly backed up and not particularly safe.

READ MORE: Two-vehicle crash leaves car on its side on Hwy. 6 in Hamilton

Over two decades ago, the province conducted an environmental assessment in the area, foreseeing significant increases in traffic as it continues to grow.

“The result will be less congestion, safer travel, and a better connection for thousands of drivers who depend on this route every day,” said Sarkaria.

The project will also include the construction of new municipal roads, water mains and sanitary sewers, and a complete elimination of traffic lights.

Ontario says they are investing over $31 billion over the next decade to build, repair and expand highways, and roads and bridges.

GIP Paving Inc. was awarded the contract to build the new interchange.

In the long run, the new system is welcome news for local businesses.

READ MORE: Two-way traffic returning soon amid Waterdown bridge construction

“One of the positive long-term effects we’re anticipating with this project, is allowing that traffic that does not intend to stop in the area to flow through, and allow the traffic that is trying to do commerce in the area, on either side of Highway 6, to be able to do that more effectively without having to contend with the volume,” said Matteo Patricelli, the executive director of the Flamborough Chamber of Commerce.

But in the short term, drivers are bracing for traffic delays from construction.

Hamilton Mayor-elect Keanin Loomis says he can’t stop the disruptions, but that he’s committed to communicating openly with local residents and businesses.

“I think what we will do and what I commit to doing with MTO (Ministry of Transportation of Ontario) and through the city as well, is to make sure that we’re communicating effectively for businesses and residents, and mitigating the impacts as much as possible,” said Loomis.

There is no word yet on how much the project is expected to cost, and when the construction will finish.

READ MORE: New pedestrian bridges coming to Oakville GO Station